Saudi Arabia Project

Home / Wind hoisting

Saudi Arabia Project



Waad Al Shamal project in KSA(500MW)


The Waad Al Shamal Wind Power Project, located in the Turaif area of Saudi Arabia’s Northern Borders Province, is a key part of the fourth round of Saudi Arabia’s National Renewable Energy Program (NREP) and one of the country’s important new energy projects supporting energy transition and sustainable development strategies. The project has a total installed capacity of 500 MW, consisting of 67 wind turbines each with a capacity of 7.7 MW. Once completed, the project will provide the region with a stable and reliable supply of clean energy, effectively easing the pressure of growing local electricity demand and supporting Saudi Arabia’s energy diversification strategy. The project is expected to achieve full-capacity grid connection and power generation by 2026, becoming one of the major sources of clean energy in northern Saudi Arabia.

1753944868427477.jpg

1774584251121706.png











As the wind turbine installation contractor for this project, FuJiang Electric is responsible for the lifting and installation of key turbine components, including tower installation, nacelle hoisting, hub assembly, blade installation, and related auxiliary lifting operations. Leveraging extensive wind power construction experience and mature technical solutions, the project team organized construction workflows scientifically and deployed large lifting equipment efficiently, ensuring that all tasks were carried out safely, orderly, and efficiently, fully demonstrating the company’s professional capabilities in large-scale wind power project construction.

1768200763238310.jpg1768200874908788.jpg
















During the project implementation, the team faced highly challenging natural conditions. The construction site is located in a long-term high-temperature and arid climate, with high summer temperatures, frequent sandstorms, and significant day-night temperature differences. Additionally, the large terrain variations in the construction area imposed higher demands on the stability of large lifting equipment and the organization of construction operations. Moreover, wind power construction requires strict adherence to wind speed conditions, and the complex and variable wind patterns posed challenges in managing lifting operation windows. To address these adverse factors, the project team implemented meticulous construction management, prepared emergency response plans in advance, scheduled lifting windows reasonably, and strictly enforced safety management standards, ensuring that the construction process remained safe and fully controlled at all times.

1775008135454200.jpg1775008215164854.jpg

Through the collective efforts of the project team, FuJiang Electric successfully completed the high-altitude lifting and installation of key turbine components, including towers, nacelles, and blades, achieving high construction quality and maintaining good progress while ensuring safety. At the same time, the company enhanced construction efficiency by strengthening equipment management and team coordination, ensuring that project milestones were met smoothly, earning recognition and praise from the owner and other project stakeholders.

1775008423585662.jpg1775008473316326.jpg










The successful implementation of the Waad Al Shamal Wind Power Project will not only further increase the share of renewable energy in Saudi Arabia’s power mix and promote the development of local clean energy, but also play a positive role in reducing carbon emissions and advancing the transition to green energy. The project’s success has further enriched FuJiang Electric’s experience in the international wind power market and enhanced the company’s competitiveness and brand influence in the global renewable energy engineering sector.

Looking ahead, FuJiang Electric will continue to uphold the construction principles of safety first and quality priority, continuously improve its wind power construction capabilities and project management levels, actively participate in global renewable energy infrastructure development, and contribute professional expertise to advancing the global green energy transition.